IRMI feature article design liability claims recovery
In part two of this informative 4-part series on Design Liability with regard to design-build projects, Sr. Vice President Francois Wasselin digs deeper into the type of claims that arise between contractors and their designers, and the circumstances behind them. Be sure to read his in-depth article (with case studies) on Claims & Recovery, now available on IRMI’s website.